White Shimmer Sequin Triangle Cup Bikini
Development Reference

Style Code: TL-LPX-1

White Shimmer Sequin Triangle Cup Bikini

Sequin and bead embroidery craftsmanship. Custom patterns are available, requiring a separate mold. The cost is determined by the complexity of the pattern, typically starting from 80-100 USD.

Capability Snapshot

What it shows:

White sequin fabric, triangle cup halter design, side-tie bikini

Can be developed as:

Beach vacation, pool party, photo shoot

Customization:

Sequin color, fabric material, Logo customization

Target Customers:

Swimwear brands, e-commerce brands, resort retailers

Contact on WhatsApp

What This Solution Shows

  • Develop matching sequin fabrics and patterns
  • offer color and size customization
  • and provide OEM/ODM quick-response manufacturing for small orders.

What We Can Develop From This

  • Swim shorts in ribbed or smooth fabric
  • Bikini bottoms (high-waist, mid-rise, cheeky, full coverage)
  • Matching bikini or sports top sets
  • Active beachwear sets and co-ord options
  • Different waistband heights and leg openings
  • Lined or unlined constructions

Customization Directions

  • Fabric: ribbed nylon/spandex, recycled nylon, etc.
  • Color: solid, contrast, seasonal colorways
  • Logo: heat transfer, silicone, embroidery
  • Waistband: fold-over, encased elastic, drawcord option
  • Labels: size label, care label, brand label
  • Packaging: polybag, zipper bag, custom packaging

Recommended Supply Chain Options

Multiple sustainable & premium options available.

Production Notes

  • MOQ: 60 pieces per style per color, mixed across 1–4 sizes (for example S/15, M/15, L/15, XL/15).
  • Sampling: 7–15 days, plus shipping. Counted after the agreed starting conditions are met.
  • Bulk Lead Time: 15–25 days after sample confirmation.
  • Available with or without lining
  • Size range confirmed per project
  • Private label & custom packaging supported
  • Physical-service prices, quantities, and timelines are project references. Confirm the selected materials, scope, and current quotation before committing.

Related Solutions