PLAN YOUR DEVELOPMENT

A clearer timeline.
A better launch plan.

Choose your materials and details. See what sets the pace for your swimwear sample or production order.

One style. Multiple sizes.Estimates based on OYOYI process timings.
01

Choose your fabric

Material preparation before sample making.

Required
02

Add your finishing details

Select only what your project needs.

Optional
Hardware & accessoriesRings, sliders and brand hardware
Packaging bagsStock or custom brand packaging
Hygiene linersProtective liners for swimwear

Materials are prepared in parallel. The longest selected lead time sets preparation.

Updates as you choose. No sign-in required.
THE LOGIC BEHIND YOUR PLAN

Parallel where possible. Sequential where necessary.

01 / PREPARATION

The longest lane wins.

Fabric and selected trims are prepared together. Care-label procurement runs in parallel, including in production.

02 / PRINTING

Cut first. Then print.

In production, heat-transfer and screen printing start after fabric cutting. When both are selected, their 2-day stages run in parallel.

03 / DELIVERY

Plan freight by weight.

30–200 pieces: express, approximately 7 transit days. Above 200: send a first batch by express, with the rest by sea or standard freight to support sales and control costs.

View all timing assumptions+
OYOYI supplied process timings · factory working days
Material or processSampleProduction
Nylon + spandex / polyester + spandex1 day procurement2 days to cutting
Digital print fabric2 days4 days to cutting
Direct print on nylon + spandex7 days7 days to cutting
Custom-developed fabric15 days10 days fabric + 2 days cutting
Hardware · stock / custom1 / 10 days8 days
Packaging bags · stock / custom0 / 10 days8 days
Custom brand hangtags10 days8 days
Hygiene liners · stock / custom0 / 5 days3 days
Custom care labels7 days, parallel7 days, parallel
Heat-transfer logo / screen print5 days each, parallel2 days each, after cutting

Selected stock and custom trims use the same supplied production timing: hardware 8 days, bags 8 days, hygiene liners 3 days. Not required = no preparation lane. Sample stages after preparation: making 1 + confirmation 2 + one revision 1 factory working days; DHL adds an estimated 7 transit days. Transit days are not factory working days; this tool does not promise a calendar arrival date.