
Development Reference
Style Code: TL9620-1-6
Deep V Gradient Open-Knit Bikini 4-Piece Set
Fabric colors can be customized, and we accept OEM/ODM brand orders. We offer dropshipping services and manage swimwear supply chains for overseas brands. A unified SaaS system provides transparent and fair management of progress, production, shipping, quality inspection, logistics, and more. Our proprietary system integrates all domestic and international channels.
Capability Snapshot
What it shows:
Deep V-neck gradient green knit texture, long-sleeved cover-up with drawstring mini skirt
Can be developed as:
Beach vacations, pool parties, vacation photography
Customization:
Color customization, fabric texture, size adjustment
Target Customers:
Swimwear brands, resort e-commerce, boutique buyer shops
What This Solution Shows
- Develop matching knitted rib fabrics
- support custom ombré dyeing processes
- provide OEM production for 4-piece sets.
What We Can Develop From This
- Swim shorts in ribbed or smooth fabric
- Bikini bottoms (high-waist, mid-rise, cheeky, full coverage)
- Matching bikini or sports top sets
- Active beachwear sets and co-ord options
- Different waistband heights and leg openings
- Lined or unlined constructions
Customization Directions
- Fabric: ribbed nylon/spandex, recycled nylon, etc.
- Color: solid, contrast, seasonal colorways
- Logo: heat transfer, silicone, embroidery
- Waistband: fold-over, encased elastic, drawcord option
- Labels: size label, care label, brand label
- Packaging: polybag, zipper bag, custom packaging
Recommended Supply Chain Options
Multiple sustainable & premium options available.
Production Notes
- MOQ: 60 pieces per style per color, mixed across 1–4 sizes (for example S/15, M/15, L/15, XL/15).
- Sampling: 7–15 days, plus shipping. Counted after the agreed starting conditions are met.
- Bulk Lead Time: 15–25 days after sample confirmation.
- Available with or without lining
- Size range confirmed per project
- Private label & custom packaging supported
- Physical-service prices, quantities, and timelines are project references. Confirm the selected materials, scope, and current quotation before committing.